Reference detail

ŽDB GROUP a.s.

Ivenstor
ŽDB Kordy
Type
Industrial construction
Realization date
may 2012 - june 2012
Budget
1 900 000 Kč
Place
Bohumín

Under the terms of the contract an illumination reconstruction in production facilities covering an area of ​​11,172 m2 was done. The reconstruction involved removing and disconnecting the existing distributors and a subsequent delivery and an installation of 11 pcs of new distributors for complete lighting of this space. The replacement of the lights took place during the full operation production above the machines at the height of 6.5 m.The installation was complicated by heavy dust and the temperature which in some places reached up to 55°C. Despite these complications the agreed implementation time of 1 month was kept and after a problem-free operation test the work was handed over to the investor.