Reference detail
Expansion of the factory in Velim
Ivenstor
BallAerocan CZ s.r.o.
Type
Industrial construction
Realization date
september 2016 - may 2017
Budget
17 500 000 Kč
Place
Velim u Kolína
COBAP s.r.o. implemented the expansion of BallAerocan CZ:
Stage 1: Complete delivery and assembly of the transformer station including the HV connection (PS207).
Stage 2: complete design of supply and installation of heavy-current wiring of buildings SO03, SO06, SO51,52, SO 54, SO60, LED luminaires for these objects, IO 510 – outdoor lighting and IO 511 – in-line NN distribution.
The work was handed over in the required quality and deadline.