Reference detail

Reconstruction of SPA & KUR Hotel Prague in Františkovy Lázně

Ivenstor
CPI Hotels, a.s.
Type
Restaurants and accommodation centers
Realization date
march 2016 - july 2016
Budget
8 000 000 Kč
Place
Františkovy Lázně

The company COBAP s.r.o. has completed the reconstruction of the Hotel Prague in Františkovy Lázně. Construction was carried out in a very short period of time, with regard to the requirements of the investor, who wished to interrupt the operation of the hotel for the shortest time possible.

The delivery by our company consisted of low-voltage current and high-voltage current electrical wiring, and a system for measurements and regulation. The supply of low-voltage current included an EPS system, a telephone exchange, structured cabling including WI-FI, CCTV and STA.