Reference detail
NEW DOX Praha
Ivenstor
BOX a.s.
Type
Culture
Realization date
december 2016 - march 2018
Budget
12 400 000 Kč
Place
Praha-Holešovice
COBAP s.r.o. completed the construction of NEW DOX Prague. It was relatively demanding reconstruction of the existing building from the 1970s and the extension of two new buildings. Our supply was heavy-current and low-current installations, including a supply of 90 kVA UPS. This gallery with a hall for 500 people will be used primarily for cultural events. There should be a school for architects, and there will be theater performances, concerts and other performances in the hall. The work was completed in the required deadline and quality.