Reference detail

Multifunctional building – EJH

Ivenstor
Erwin JUNKER Grinding Technology a.s.
Type
Restaurants and accommodation centers
Realization date
may 2014 - june 2015
Budget
26 700 000 Kč
Place
Holice

The subject matter of the contract was the supply and installation of high-voltage and low-voltage current wiring (EPS, ERO, CCTV, ACS, SK, IP phones and phone panel, STA) of the AV equipment, siemens measuring and regulations, technological distributors of the LV transformer, the diesel generator, the lighting, the intercom and HV connection to the extent of the documentation prepared by Ackermann architekti s.r.o. (excluding the delivery and installation of the “Parking system with an automatic teller”