Kbely Primary school
Ivenstor
Městská část Praha 19
Type
Education
Realization date
february 2015 - june 2015
Budget
6 900 000 Kč
Place
Praha
COBAP s.r.o. has completed an order for Kbely primary school. COBAP s.r.o. shared in the supply of complete wiring made up of high-voltage current, a passive lightning conductor, CBS, UPS, a branch telephone exchange, an emergency sound system, an alarm security system, structured cabling, unified timing, emergency WC calling for physically handicapped persons, the installation of a common television aerial and an electronic fire alarm system including connection to PCO HZS.