Reference detail

HALA PROLOGIS DC7 JIRNY

Ivenstor
ProLogis Czech Republic
Type
Industrial construction
Realization date
march 2015 - june 2015
Budget
16 000 000 Kč
Place
Jirny

The object is a DC7 storage hall with a size of 11,000 square metres. The hall includes an administrative built-in structure. In the construction process, COBAP provided the supply of heavy-current electrical installations, high-voltage connection, complex transformer station equipment, public lighting distribution systems of the entire area, electronic fire protection system connected to Central Security Desk, lightning conductors and earthing systems, and the drawing up of implementation project documentation. The subject of delivery was extended to include heavy-current and light-current electrical installations for the end tenant, DEMO AUTOPLAST.