Reference detail
BEAS, a. s.
Ivenstor
Bakery BEAS
Type
Industrial construction
Realization date
july 2014 - march 2015
Budget
11 000 000 Kč
Place
Choustníkovo Hradiště
The property consists of a two-story building, extensive administration space, shipping area and a wastewater treatment plant. The bakery will provide up to 120 new job positions and operates with the latest technology for the production of ordinary as well as soft pastry. Concerning the construction the company COBAP s.r.o. took part in the delivery of high-voltage wiring, low-voltage wiring, lightning + grounding, installation of a phone switchboard with DECTs, structured cabling, a supply of active elements, technological installations, an electronic fire alarm system, an extensive CCTV system, an access control system with attendance and processing of a detailed project documentation.