COBAP s.r.o. is constructing a Sports Regeneration Centre in Turnov, where operational testing took place in September in the winter stadium. Currently, lighting is being installed above the ice surface after which we stand on the threshold of an interesting task – to create the construction that attaches the lights so as to copy the dome-like shape of the roof. This work must be carried out by 7.9.2015, when work will begin on the ice surface itself in order that the opening game of the season, which is scheduled for 15.10.2015, can take place here.