In March this year, the implementation was launched by preparing the main cable routes, making penetrations and construction openings. Towards the end of March 2015 was completed the entire gross tracing of low-voltage, high-voltage current distributions as well as the MaR distributions and on the first floor of the building HZS, the implementation is being carried out at the same pace on the second floor.